FRG-2026 · FLOOR STATUS: ACTIVELive Production Metrics
1.2M+
Units Shipped YTD
Across 14 active production cells
99.4%
First-Pass Yield
Industry benchmark: 96.1%
23-Day
Avg. Lead Time
From approved drawings to dock

Ready to move your BOM off the whiteboard? Quotes returned within 48 hours.

§ 01 — Process Controls

The floor runs three processes.
Your part needs one.

Capacity Utilization
87.2%
CNC
91%
Molding
84%
Assembly
78%
±0.005″
Tolerance held across 100% of lots

CNC Precision Machining

Five-axis machining centers run aluminum, stainless, and engineering-grade thermoplastics in lights-out shifts. From heat sinks to structural housings, every feature is verified against your CAD file before it leaves the cell.

Materials
Al 6061/7075, SS 304/316, POM, PEEK
Tolerance
±0.005″ standard · ±0.002″ precision
Surface Finish
Ra 0.8–3.2 µm · Anodize / Powder Coat
Run Size
50–500K units per order
650T
Max clamp force — 40T to 650T fleet

Injection Molding

Multi-cavity tooling in P20 and H13 steel. We run PP, ABS, PC, PA66, and POM daily. Mold flow analysis on every new tool; small-batch trials before full production release. Consumer electronics enclosures, connector housings, and appliance bezels — all from the same floor.

Press Fleet
40T – 650T (22 machines)
Materials
PP, ABS, PA66, PC, POM, PE
Tool Lead Time
4–6 weeks from approved design
Cavitation
Single to 16-cavity production tools
98.7%
Assembly accuracy rate, trailing 12 months

Sub-Assembly & Kitting

PCB insertion, hardware fastening, labeling, and retail-ready packaging run on the same floor as fabrication. One PO, one shipment, one point of contact. Consolidate three suppliers into a single container.

Services
PCB insert · Hardware · Labeling · Kitting
Packaging
Retail · Bulk · ESD-safe · Custom thermoform
Throughput
Up to 8,000 assemblies per shift
Min. Order
2,500 units

Ready to move your BOM off the whiteboard? Quotes returned within 48 hours.

§ 02 — Compliance & Quality

Certifications aren't a shelf trophy.
They run on every traveler sheet.

Every lot released against a documented control plan. SPC charts are live on the floor, not filed after the fact.

QMS
ISO 9001:2015

Quality Management Systems — scope covers all production cells, incoming inspection, and final release.

AUTOMOTIVE
IATF 16949

Automotive-grade process discipline applied to every run. APQP, PPAP, FMEA, SPC, and MSA baked into standard workflow — not just available on request.

CONSUMER ELECTRONICS
RoHS 2.0

All materials and surface treatments comply with EU Directive 2011/65/EU. CoC issued with every shipment of consumer electronics components.

SAFETY
UL Listed Facility

Production floor and electrical systems certified under UL 508A. Required for any component destined for North American market appliance or industrial control applications.

Manufacturing Benchmark ComparisonForge vs. Industry Avg · Trailing 12 Months
Source: IPC-7711/7721 · Internal QMS
MetricForgeIndustry AvgDelta
Defect Rate (PPM)3121,800↑ 82.7%
On-Time Delivery97.8%91.2%↑ 7.2%
Tooling Amort. Cost / Unit$0.18$0.31↑ 41.9%
Scrap Rate0.6%2.1%↑ 71.4%

Ready to move your BOM off the whiteboard? Quotes returned within 48 hours.

§ 03 — Sourcing Memo Evidence

Three verticals. Real tonnage.
Paste these into your memo.

Named verticals, verified lot sizes, actual defect figures. No vanity metrics.

Circuit boards and electronic components on manufacturing workbench
INJECTION MOLDING + ASSEMBLY
Consumer Electronics
Mid-Market Audio Hardware Co.

18,000 enclosures. 19 days. Zero field returns.

A Bluetooth speaker manufacturer came to us with a 14-week backlog at their previous supplier and a retail launch date that couldn't move. We re-tooled in P20 steel, ran mold flow analysis on their existing CAD, and pulled forward the schedule by 11 days. Defect rate on final inspection: 0.3%. First-pass yield: 99.7%.

Units Delivered
18,000
Lead Time
19 days
Defect Rate
0.3%
Schedule Pull-In
11 days
CNC machining center cutting precision aluminum parts
CNC MACHINING · AL 7075
Industrial Equipment
Hydraulic Controls OEM, Midwest

4,200 machined housings. ±0.003″ across every lot.

A hydraulic valve manufacturer was scrapping 4–6% of incoming parts from their previous shop on dimensional non-conformance. We ran SPC on the first 200-piece pilot lot, locked the process at Cpk 1.67, and held that capability through a 4,200-unit production run. Zero dimensional rejects on their incoming inspection line for six consecutive shipments.

Units Produced
4,200
Tolerance Held
±0.003″
Scrap Reduction
−82%
Cpk Achieved
1.67
Engineer holding electronic prototype device in production facility
PROTOTYPE → PRODUCTION
Hardware Startup
Series A IoT Device Company

From prototype to 10,000-unit PO in one supplier relationship.

Founder walked in with a 3D-printed prototype and a $1.4M Series A. We ran DFM review, identified three features that would have blown their tooling budget, redesigned them collaboratively, and delivered a 500-unit NPI run in week six. Full 10,000-unit production order shipped by Q3 — the quarter they promised their investors.

NPI Run
500 units
Production Run
10,000 units
DFM Savings
$38,000
Q3 On-Time
✓ Delivered

Ready to move your BOM off the whiteboard? Quotes returned within 48 hours.

§ 04 — The Quote Process

Three steps from drawings
to a number you can defend.

No black-box pricing. No 14-day wait. The RFQ form on the next page takes 4 minutes to fill out.

01

Upload Your Drawings

STEP, IGES, DXF, or PDF. If you have a spec sheet, attach it. If all you have is a sketch and a target price, that works too.

02

Engineer Review in 48 Hours

A process engineer — not a sales rep — reads your files and returns a model-fit recommendation with preliminary costing.

03

Formal Quote with No Surprises

Line-item breakdown: material, tooling amortization, per-unit cost at your run quantity. No hidden setup fees. No rounding up MOQ.

FRG · RFQ PORTAL

Your part number is waiting
on the traveler sheet.

Quotes returned within 48 hours. Engineer review, not a form letter. Transparent line-item pricing you can put in front of your CFO.

What buyers say after their first quote

"The line-item breakdown showed us exactly where our tooling costs were going. No other supplier had ever done that."

Marcus T.
VP Procurement, Appliance OEM

"We had a prototype on Monday. Forge had a formal quote with DFM notes in our inbox by Wednesday morning."

Priya S.
Founder, IoT Hardware Startup